We prepare a construction work schedule listing of a project’s milestones, activities, and deliverables. Dependencies and resources are defined for each task, then start and finish dates are estimated from the resource allocation, budget, task duration, and scheduled events.

  • We use Primavera and MS Project software to create the work Schedules.

To ensure your project is always completed on time and reduces risk, US Estimating offers Critical Path Method (CPM) design services for the construction sector. Our all-encompassing method of construction planning simplifies the complicated project and allows you to choose the most lucrative way to complete your project on time and within budget.

CPM Planning Consultant

In all phases of the construction project from the idea to the design and from the construction preparation to the completion. Our CPM planning consultant maintains close cooperation with the project teams. By considering all specifications, outlined financial constraints, strict industry standards and contractual obligations. We help our clients streamline their projects, resulting in increased revenue and on-time project completion.

Why Should You Choose CPM Project Planning?

Completing the project on schedule and within budget are the two most important success factors in the construction industry. It is more important than ever to manage these two key aspects well as the complexity of the project increases. A detailed and well-planned CPM schedule is the only way to achieve this.

Owners occasionally hire our services, and our experts work for them to create the best possible schedule by coordinating with the contracting teams. However, sometimes our professionals assume the role of an impartial third party for owners and contractors, working to create plans for managing and monitoring resources throughout the project.

As part of the project teams, our project planning specialist works with the owner, project manager or general contractor, subcontractors, and architects to:

  • Create a basic CPM schedule to outline project strategy.
  • Plan ahead in HR management and purchasing.
  • Critically assess the project’s risks and develop mitigation plans.
  • Investigate delays and develop strategies for resuming the project schedule.
  • Continuously assessing progress to ensure it is consistent with project milestones and implementing changes.
  • Consider likely risks and develop mitigation techniques.
  • Resolve conflicts within project work teams to avoid disrupting project flow.
CPM Scheduling Services
  • Baseline CPM planning
  • CPM schedule analysis
  • CPM update
  • Preliminary planning
  • Planning the design phase
  • Construction phase planning
  • Overall project planning
  • Recovery Planning
  • Linear planning
  • Inventory planning
  • Project implementation cost planning
  • Construction management planning
Our services
  • Preliminary project schedule
  • Initial project schedule
  • Periodic schedule updates
  • Project milestone update report
  • Critical path update report
  • Narrative reports
  • Activity reports
  • Logic reports
  • Float total report
  • Earnings report
  • Time Impact Analysis
  • Delay analysis
  • Risk analysis
Extensions and conversions in the following sectors:
  • Publicity
  • Residential
  • Commercial
  • Civil
  • Historic Buildings
  • Healthcare
  • Infrastructure

How it works?

1. Project:

You can send/forward us the plans, specifications, and bid invitation in PDF format or via Dropbox link, Google Drive or any other website that allows us to review them.

When you forward us the plans via email, please do mention to us whether you would be bidding the whole project or selected trades so that we can review the drawing accordingly.

2. Reviewing & Proposal:

We’ll go through the plans with you in detail and provide you with a fee proposal for your approval. Only after your approval, we will start the work and there are no charges to review the plans.

Format & Software

  • Our work would be in an Editable Excel Sheet – if required, we can use your template or can put your company details on the Estimate/Proposal.
  • For to do quantities takeoff – we use software PlanSwift, BlueBeam, On Screen Takeoff (OST). Mostly we use PlanSwift.
  • We will be very happy to provide Software files as well as Markups/color drawings (if required).

Our Fees & Turnaround Time

  • We are dedicated to providing the highest quality services within our customer’s budgets.
  • We are very flexible in our fees; we are always after a long-term relationship not after one job Fee. For us, repeated work is more important than high charges of one job.
  • We charge Per Project/Plan.

Our Fees Depend on size and scope of the work But

  • Our average fees are like $250, $350, $450, $550 and we even do jobs in $100.
  • You can pay us Per Project, or you can pay us Weekly, Monthly or Quarterly.
  • We can complete the jobs within 2 to 3 working days.

I assure you that with us, you will never have any issues of quality or turnaround.